I apologize for not being in contact for several weeks, but we have been spending most of our time getting the mechanical on the house completed. The good news is that the electric, plumbing, and HVAC inspections have passed. The bad news is that the next month we are going to have to work like mad to get our family in by Christmas. This is ambitious (especially December being so crazy for all of us), but we believe it is doable.
The planned schedule is as follows:
- Nov 15-19 – finish structural needs for inspection
- Nov. 21 - have structural inspection passed
- Nov. 26 – have insulation installed (we could use volunteers!)
- Dec. 4 – have drywall completed (we are contracting this out because of skill level needed and time constraints)
- Priming/painting
- Installing plumbing fixtures
- Installing kitchen cabinets/appliances
- Installing flooring
- Installing electric fixtures
If you or any of your people can help, please call Andy Scott (404-5162) or myself (738-4129) and we will make arrangements.
I GREATLY appreciate your patience through this process and your dedication to open the door to homeownership for low-income families.
David C Gay
Executive Director
Lower Lights Ministries, Inc.
1066 Bellows Avenue - Columbus, Ohio 43223
614.228.3855 (phone) 614.228.1255 (fax)
www.lowerlights.org
No comments:
Post a Comment